OFFSHORE INSTALLATION
-
Design of Permanent and temporary disconnectable LNG Terminals for FSU's
-
Dynamic hose analysis for LNG cryogenic hoses.
-
Side by side LNG Offloading Analysis.
-
Offshore installation analysis, procedures and management.
-
Side by side hydrodynamic behaviour and interactions. The use of specialised software to calculate the fluid dissipation which is critically important to get realistic prediction of resonance in the gap between two ships.
-
Tank sloshing analysis.
-
LNG Terminals for remote locations
-
Transfer of LNG to through the floating terminal to the power station for direct use.
DECOMMISSIONING OF OFFSHORE SYSTEMS
-
Review of decommissioning technical requirement.
-
Preparation of decommissioning procedures, engineering & analysis
-
Provision of preservation, lay-up decommissioning, & abandonment requirements and procedures
-
Environmental Impact Assessments
-
Reefing of systems offshore